Short construction period
Light steel components are prefabricated in the factory and assembled on site in modular form. The average construction period is only 1-3 months (traditional brick-concrete structures take 6-12 months), which greatly shortens the construction period and reduces labor costs.
Little impact from weather
Dry construction (no need for a lot of wet work) can still be carried out on rainy days and in winter, reducing weather delays to project progress.