Industry News

Understand the latest company dynamics and industry information

Current Location:Home>News>Industry News
All 65 Company News 28 Industry News 37

Pre installation preparation and line positioning of light steel keel

Date:2025-05-08   Visits:1024

Design and measurement: Determine the ceiling height, shape, and lamp position based on the room layout, accurately measure the length, width, and height data, and mark the pipeline direction to avoid conflicts.

Bounce line:

Use a laser leveling device to mark horizontal lines (usually 1050mm from the structural board surface) on the wall and top surfaces as elevation benchmarks.

Pop up the main keel position line (spacing ≤ 1000mm) and suspension rod positioning line (spacing 900-1200mm, first-row distance from wall < 300mm).

Key controls: horizontal line accuracy, parallel arrangement of the main keel in the longitudinal direction of the room, and arching of large-area ceilings according to the short span of 1/200-1/300.

Previous:Composition and classification of light steel keel

Next:Installation sequence of light steel keel

make a comment:

Comment Record:

No data found!