Installation of auxiliary keel and cross bracing keel

Date:2025-06-19   Visits:1015

After the installation of the main keel is completed, the installation of the auxiliary keel and the horizontal support keel should be carried out in sequence. Usually, the spacing between secondary keels is set to 400mm, while the spacing between horizontal bracing keels is 600mm. In addition, secondary keel hangers also need to be installed in the forward and reverse directions in order to ensure balanced stress and reduce deformation.

Previous:Construction of light steel keel ceiling with hanging bars and installation of main keel

Next:Fixing the edge keel of gypsum board ceiling